American Airworks™ PO Box 1000, Sophia, WV 25921-1000 / 1-800-523-7222
Survivair Technical Bulletins
Survivair Technical Bulletins






Survivair Technical Bulletin Downloads - PDF Format

The following downloads require Adobe Acrobat Reader, version 3.0 or later.
Click here to get Acrobat Reader.


131 - Survivair Repair & Maintenance Class
130 - Update of Technical Bulletins
129 - Torque Specifications for SCBA Cylinder and Valve Assemblies, Installation Instructions
128 - Torque Specifications for SCBA Cylinders and Valve Assemblies
127 - Discontinuation of the Use of Never-Seez® on Survivair® Cylinder Valve Threads
126 - Batteries for SCBA & SAR Products
125 - Cylinder Filling Procedure
124 - Respirator Overhall Requirements
123 - 905700 Portable Test Console (PTC)
122 - Second stage regulator outlet fitting Panther, Cougar, Panther SAR, HIP-PAC
121 - Update of Technical Bulletins
120 - Panther and Sigma second stage regulator, main valve and bypass plug
119 - Panther plain whistle and warbling whistle alarm cap sound level test procedures
118 - XL series of SCBA
117 - Trigger pin lubricant
116 - First stage cap screw Loctite and torque procedure
115 - Adam repair cost and gauge line torque
114 - TwentyTwenty RCS/Small Talk Plus pin replacement kit
113 - Procedure for changing from non-locking cylinder valve handwheel to locking collar style
112 - XL-30 regulators
111 - Adam function buttons & gauge line torque procedure
110 - Trigger pin lubricant
109 - Improper SmallTalk battery installation
108 - Inspection and replacement procedure for Luxfer SCBA hoop-wrapped cylinders
107 - SmallTalk voice projection unit for TwentyTwenty
106 - Updates of Technical Bulletins (all Survivair products)
105 - Panther SCBA serial numbers
104 - Marking of Life Support product components
103 - Cylinder filling procedures
102 - Lubricants, cleaners and adhesive
101 - Twenty-Twenty style facepiece, headnet installation and orientation
100 - SmallTalk speaker grill re-attachment
99 - Sigma forged first-stage regulator
98 - Storage procedures for Survivair SCBA
96 - Survivair Gas Detectors
95 - Cold weather operation Sigma, Omega, Secoba, Lo-Pro, Mark 1, Mark 2, XL-60, XL-30, and S-30
94 - Clamp replacement, EBA-5/10/HF5
93 - Torque specifications for SCBA cylinders and valve assemblies
92 - Replacement of o-rings in Sigma SCBA
91 - Cylinder valve latch assembly
90 - Mark 2 SCBA overhaul kit revisions
89 - Use of Biosystems PosiChek with Survivair SCBA, SAR, and HIP-PAC
88 - SCBA cold weather "freeze-up"
87 - Change to maximum operating pressure for constant flow SAR
86 - Hose clamp requirement for low pressure hose used on NFPA certified SCBA
85 - Salvage-Master wet vacuum
84 - Regulator body, HIP-PAC inspection and maintenance procedures
82 - Luxfer "Composite Safety Notice"
81 - Mark 2 overhaul kit
80 - Mark 2 over-the-shoulder gauge hose replacement
79 - Deletion of designated overhaul replacement parts; cartridge alarm overhaul
78 - Dip tube replacement procedure
77 - 27" rubber gauge hose is approved for use on the Mark 2 SCBA
76 - Portable test console upgrade
75 - Mark 2 and XL-30 SCBA and Mark 2 SAR regulator quick connect adapter installation procedures
74 - Fit testing pressure demand SCBA and SAR respirators
73 - Mark 2 over-the-shoulder gauge hose
72 - Testing the Mark 2 , 9813 and 9816 series, half mask, pressure demand, SAR
71 - New bypass spring
70 - Black bodied alarm
69 - Reduction in overhaul parts for XL series pancake regulator
68 - Mark 2 SCBA/SAR second stage regulator parts
67 - Identifying SCBA Approvals
66 - Mark 2 and SAR regulator inlet thread sealant and inspection procedures
65 - SCBA used in excessive heat and flashover
63 - Mark 2 NFPA harness inspection guide
62 - Christo-lube
61 - Mark 2 SCBA first-stage piston
60 - Low pressure hose clamps on SCBA units
58 - Low pressure hose clamps on SCBA units
57 - Survivair SCBA quick connects
56 - SCBA cold weather maintenance
55 - Burst disc kit, low pressure SCBA 30 minute cylinders
54 - Mark 2 SCBA alarm cartridge
53 - Mark 2 SCBA over-the-shoulder gauge
52 - Change in formaldehyde approval
49 - Corrsion control of alarm assemblies used on the XL/MK-1/SAR systems
48 - Inspection of Mark 2 low pressure hose quick disconnect on all models
47 - Improved Mark 2 alarm performance
46 - Improved Facepiece Mounting Regulator
40 - "Sticky" exhalation valve on the Mark 2 mask
38 - Mark 2 gauge line
33 - SCBA in excessive heat
32 - TC-13F-44 approval plate
28 - Survivair combination self-contained breathing apparatus (HIP-PAC) and supplied air respirator
27 - Survivair HEPA filter cartridges
26 - Mandatory retrofit of 9101-50 cap and chain accessory for use on Mark 2 SCBA
15 - Maintenance for Y-adapter
11 - E nozzle for 9418 mask
09 - 9606-18 poppet LP (white) and 9606-10 poppet HP (black)
04 - Facepiece cleaning procedure
01 - Overhaul Manual Change



American Airworks
Survivair Technical Bulletins

Air Cascades | Air Compressors | Air Control Panels | Air Fill Stations | Air/O2 Boosters | Breathing Apparatus |
Confined Space Equip.
| Equipment Dryers | Hose Reels | Oxygen Systems | Paintball Air Products |
Respirator Fit Testing | Salvage Master
| SCBA Software | Thread Saver® | Ultrasonic Cleaners
Home | What's New | SCBA Notices | Information Center | Links | Site Map | Contact Us

American Airworks™ • PO Box 1000, Sophia, WV 25921-1000
1-800-523-7222 • 304-683-4595 • Fax: 304-683-3257



Copyright 2006 American Airworks. All rights reserved.